2013年11月19日 星期二

採購策略的簡易版本配置示範

Setting up simple Release Procedure for Purchase Requisitions

Release Procedures (approval) can be used for Purchase Requisitions (PR), Purchase Orders (PO), RFQ's, Outline Agreements and Service Entry Sheets. The principle is exactly the same for all. If you can master one, you will know them all. 

Lets set up release procedures for PR for the following example: 

Our company have got 2 plants: Plant 3100 (London) and plant 3600 (New York). 
  • For New York (plant 3100), if PR item value is between 0 - 1000 dollars, then PR needs to be released by one person (person B) 
  • For New York (plant 3100), if PR item value is bigger than 1000 dollars, then PR needs to be released by two people (first by person B, then person C) 
  • For London (plant 3600), if PR item value is bigger than 1000 dollars, then PR needs to be released by two people (first by person A, then person C).
 


Key terminology: 
  • Release Codes - The different levels that the approval will go through. 
  • Release Groups - Grouping of strategies. 
  • Release Strategy - Unique, set of condition, sequence and levels of releases. Every line in diagram is a Strategy (so we have 3). 
  • Release Indicator / Status - The status of PR as it moves through the strategy. Example 'Block' (can't create PO yet) or 'Final Release' (can create PO from PR)
Here is a summary of the steps to follow to set up our example: 
  • Create Characteristics & link to comm. structre (CEBAN for PR) 
  • Create Class & link to characteristic 
  • Create Release Groups & link to class 
  • Create Release Codes 
  • Release Indicator 
  • Set up strategies 
    - Strategies & Codes 
    - Prerequeirements 
    - Status 
    - Assign values for strategies 
  • Set overall / item for doc type (PR only) 
  • Create and allocate autorisation profiles
--------------- DETAILS OF SETTING IT UP --------------- 

Create Characteristics & link to communication structure (CEBAN for PR) 

Here we define which fields are used to determine the strategy that will kick in. In our case we used 'Plant' and 'Item value'. Not all fields in the PR can be used. For a full list of fields that can be used to determine the release startegy, see tcode se12 table CEBAN. 

 

 
 

So the two fields that will be used is: 

Field CEBAN-WERKS for Plant 
Field CEBAN-GSWRT for Item Value 

We need to create a characteristic for every field. tcode ct04 
Any characteristic name can be used. Keep something descriptive to avoid confusion. 

For Item Value -- lets create characteristic Z_GSWRT 
 

First go to Additional Data tab and enter the table/field (and Enter) 
 

Enter currency to be used in the Basic data tab. 
Also select multiple values and Intervals allowed 

The Intervals allowed will allow us to assign a range of values, example: If PR value is 0 - 1000 USD ..... 

 

Save the characteristic 

For Plant -- characteristic Z_WERKS 
Again, the table/field name in Additional Data to enter table/field 

 

Again set multiple values and save the characteristic 
The multiple values is to assign more than one plant to strategy, example: If PR for plant 3100 and plant 3600 is ... 

Create Class & link to characteristic 

Create a class (simply to group the characteristics). Again any name can be used. Tcode CL01 -- Create Class. The Class Type must be 032. 

 

Configure Release Procedures 

Above actions was all master data. We now need to do some configuration. Menu: IMG > Materials Management > Purchasing > Purchase Requisition > Release Procedure > Procedure with classification > Set up procedure -- (tcode OMGQ in older SAP versions) 

 

Create Release Groups & link to class 

We have two groups to create AA and AB. We need to indicate the class we are working with, in out case Z_PR. 

 

Create Release Codes 

Create all the release code / group combinations. This is all the dots in diagram above. So we have 4. 

 

Later on, authorisation profiles will be linked to these code / group combinations. 

Release Indicator 

First we create the different statusses that the PR can be in throughout it lifecycle. Later on (below), we will be linking using these statusses. Here is the standard SAP indicators, wou probably wouldn't need to add any. 

 

We will be using two of these -- X (Block) and 2 (Released) 

 

 

Under the Details section, you can indicate which documents can be created from this PR. For Indicator 2, one can create PO's and RFQ's. 

With Field Selection you can define which fields can be changed. This is the same indicator that gets used with document type configuration to make some fields read only, mandatory, hidden. 

Set up strategies - Strategy & Codes 

Every line in our diagram above is a strategy. So We have three 
Lets call them: 
Group AA / Startegy S1 -- Code L1 (for plant 0001) 
Group AA / Startegy S2 -- Code L1 & L2 (for plant 0001) 
Group AA / Startegy S2 -- Code L1 & L2 (for plant 0002) 

 

Here are the settings for AA / S2 

 

Set up strategies - Prerequisites 

For every strategy, we need to define a release prerequisites. This indicate if one code need to take place before the other. In this case, level 2 (L2) can only take place if level 1 (L1) has been released. 

 

Set up strategies - Status 

This is also done for every strategy. The screen is dependant on what groups were linked to the strategy as well as prerequisites that was set up. In this example: 

- if nobody release it then PR is block. 
- if L1 release the PR, the PR is still blocked 
- if L1 and L2 release the PR, the PR can be converted to RFQ/PO 

Out of interest, the reason why there is not a L2 only option is because of the setting in the prerequisites. 

 

Set up strategies - Values for strategies 

The values linked to strategies are master data (not configuration) and can be set in two places. Either within the configuration itself -- selecting the classification button 

 

 

Or, in classification, example CL24N 

 
 

Both methods work, the advantage of CL24N is that all the strategies can be viewed easier. 

Set overall / item for doc type (PR only) 

For Puchase Requisitions, there is an option to release either on item level or on document level. For PO / RFQ / Contracts, one can only release on header level. Back to the PR, it is highly recommended to use item release. This can be done in two places. 

Firstly where the groups were created 

 

On the document type configuration for PR 
Config menu: Materials Management > Purchasing > PR > Define document types 

 

Create and allocate authorisation profiles 

In our example we will have three people releasing, so three profiles will need to be created. Authorisation profiles can be created using tcode PFCG. 

Usage of PFCG are not being discussed here, but see below for relevant screen where the profile was created. 

 

--------------- USING RELEASE PROCEDURES --------------- 

Create a Purchase Requisition 

Lets create a PR, and see if the release procedure kicks in. In our case we will create it for plant 3600 and any value. So we will expect Strategy AB / S2 to kick in. 

Create PR -- me51n 
 

If no 'Release strategy' tab, then it didn't work. In this case all is fine. The user can see the Release Group (AB), Strategy (S2) and release indicator (X). 

(SAVE) 

Release a Purchase Requisition 

Releasing can be done per PR or collective. Lets' use the collective release. SAP Menu: Logistics > Material Management > Purchasing > Purchasing Requisition > Release > Collective Release -- ME55 

 

Select all the items to be released and then hit Save. You will see the status of the item change to the next Release Indicator. 

 

This is the absolute basics of setting up Release Procedures for Purchase Requisitions. For more posts on Release Procedures, see index of posts. 

SAP version used for this post: SAP ECC (ERP Central Component) 5.0 



從 Evernote 傳送記事

沒有留言:

搜尋此網誌

本站大事記

這個部落格(網站)內容以分享LINUX和延伸出的技術文章為主!
特別是為了工作和進修需要,搜集了不少網站連結。
希望對來這裡觀文的朋友們,有提供一些有用的資訊或文章。
但這裡的文章中,也包含個人的心情扎記和隨興言談……
若是當中沒有對上你的口味,請多包涵!

原「琳娜絲與希斯寇的邂逅」,改名為「愛上琳娜絲」!

原「琳娜絲與希斯寇的邂逅」,改名為「愛上琳娜絲」!
--原序文--
就是當LINUX遇上CISCO啦!他們的結合還能作什麼事…不就是讓這個世界的網路,串…串起來啊…不然你們那能上這網站看部落格!